Brand Name: | PERFLEX |
Certification: | CE/ROHS/ISO9001 |
Model Number: | PXF-600 |
Minimum Order Quantity: | 200 pails |
---|---|
Packaging Details: | 5 L/10L/20L per pail |
Delivery Time: | 7days around |
Supply Ability: | 20000 Ton annually |
MATERIAL: | Polyaspartic Resin + Isocyanate Hardener | Blend Ratio: | A : B = 1 : 1 |
---|---|---|---|
Color: | Transparent Or Pigmented | Feature: | Good Bonding | Weather Resistance |
Package: | 5L | 10L | 20L / Pail | Application: | Park | Road | Garden | Swimming Pool Flooring |
High Light: | Permeable Polyaspartic Clear Coat,Good Bonding Polyaspartic Clear Coat,Polyaspartic Clear Coat Permeable Floor Layer |
PXF-600 Polyasartic Permeable Floor Coating - Good bonding | super weather resistance | Ultra clear
INTRODUCTION: PXF-600 is a two-component reaction curing transparent adhesive made of polyaspartic resin and HDI hardener, with interpenetrating structure and multi-functional chemist bonding, it can provide strong adhesion and substrate adhesion for permeable floor layer. Chemical toughening and modification can give the cured good flexibility, effectively avoid the excessive brittleness of traditional adhesive, effectively absorb the stress from the ground materials, and form a certain degree of rigid flexible Island effect, it’s has good anti- QUV properties, anti-aging and yellowing resistance.
FEATURE: The process of permeable stone flooring is to bond stone with adhesive by "point bonding", that requires the adhesive must has high adhesion, weather resistance, acid and alkali resistance, water erosion resistance, wear resistance and impact resistance.
1-100% solid solvent-free formula, odorless, non-toxic, environmentally friendly.
2-Strong and tough adhesion, ultra - clear, high gloss, wetting effect on color aggregate without changing the stone primary color.
3- Adjustable viscosity to adapt to different climatic conditions and avoid back sealing of permeable products.
4- Working time is 60min, can walk 6hours and fully open traffic for 24 hours after operation.
5- Super weather resistance, anti-QUV, outdoor use.
6- Color can be ultra-clear or being customized.
APPLICATION: sidewalk, bicycle greenway, interior decorative wall, public square, road in park, campus road, community road, outdoor wall, pool floor, etc.
1 - Preparation of colored stone aggregate
2- Stone aggregate & adhesive mixing
3- Dumping and spreading
4- Stone aggregate spreading
5-Trimming and troweling
6- Waiting for forming
Tools: small mixer, mud bucket, grinder, knife
Stone Aggregate : according to the color type and stone size selected by customers.
Material: PF-600 Polyaspartic adhesive
Part A | Resin | Part B | Hardener |
Appearance | Transparent | Appearance a | Transparent |
Viscosity 25 ℃ | 1500mpas | Viscosity 25 ℃ | 1300mpas |
Specific gravity 25 ℃ | 1.05 | Specific gravity 25 ℃ | 1.1 |
Solid content | 97% | Solid content | 99% |
PROPERTIES AFTER CURING
7-day hardness | Shore D 75 |
Abrasion (CS17 wheel 750g, 500r) / Mg | 25 |
Elongation at break (%) | 5 |
Tensile strength (MPA) | 25 |
Concrete adhesion (MPA) | 2.2 |
Acid resistance | no change in 5% sulfuric acid |
Alkali resistance | no change in 10% sodium hydroxide |
- BLEND RATIO
Adhesive A : Adhesive B = 1 : 0.7
Adhesive : Stone aggregate = (3 ~ 5) : 100
- WORKING TIME
Temperature (℃) | 15 | 25 | 30 |
Mixed service life (min) | 60 | 45 | 35 |
- CONSTRUCTION CONDITIONS
Ambient temperature: 0 ℃ - 35 ℃, ambient humidity: ≤ 85%
Substrate temperature: must be more than 3 ℃ above the air dew point temperature
Cleaning agent: standard diluent of polyaspartic
- DRY TIME AND RECOAT INTERVAL
Temperature (℃) : 25
Walking opening hours (HRS): 6
Vehicle opening hours (HRS) : 24
The above data is only for guidance, and the real curing time is highly related to the ambient temperature and humidity.
Storage time: Paint - 1 year | Curing agent - 9 month
Storage temperature: 5 ℃ - 35 ℃
Paint: 20kg | Curing agent: 14kg
- Avoid direct contact with skin and eyes.
- If the paint reach the skin, it shall be cleaned with appropriate detergent. If paint comes into eyes, use plenty of water to rinse and seek medical attention immediately.
- Ensure good ventilation.
- Paint contains combustible substances. Please keep away from sparks and do not smoke near the work area.
- All health and safety regulations shall be observed on site.
- The information provided in this product manual is entirely based on our knowledge in the laboratory and in practice. But because the use of products is usually beyond our control, we only guarantee the quality of products. We reserve the right to modify the specification without prior notice
Contact Person: Laura
Address: Changsha . Hunan China
Factory Address:Baofeng Industrial Zone, Shashi County, Liuyang Changsha City, Hunan China